Performing conductor installation for 3 platforms belong to SIRRI oil field. Client: Drilling Company International (DCI)
Performing 2D high resolution seismic survey + Processing & Interpretation in FARZAD A & B fields to identify sub-seabed hazards. Client: Pars Oil & Gas Company (POGC)
Performing installation of SPD17B wellhead topside of SP17/18 south pars field. Client: LOICO
Transportation and Installation of A20 & A21 Jackets of Abuzar field. Client : Jahan-Pars/DRG IOOC
Performing Load out, Marine transportation and offshore
Installation engineering of two wellhead Jackets.
Client: Delta offshore Co.
Performing Engineering analysis and preparation of operational procedures
for Transportation and Installation of 3 Jackets.
Client: Delta Offshore, Atlas offshore
This project consist of engineering services, project management and
offshore operation management services for Load out , Marine
Transportation and Installation of two LQ topsides (FX & FY) in Foroozan
field- Persian Gulf. Wight of FX platform is 250ton and FY weight is
750 ton.
The platforms are being fabricated in ROG yard in SHARJE-UAE.
Clients: Delta offshore co., Nardis co. ,IOEC, IOOC
In this project we provided consultancy services, engineering services ,
project and offshore operation services to TASDID co. for load out ,
Marine transportation and Installation of two jackets in Reshadat field.
The jackets are fabricated in TASDID yard in Khorramshahr and
Installation subcontractor is DOT co. tP4 jacket is a production platform
jacket with 2800 ton weight and installation method is Launching
–floating upending. F4 is about 350 ton it’s a tripod flare
Clients: Tasdid, IOOC
Performing Engineering analysis and preparation of operational
procedures for Transportation and Installation of Phase 14 Jackets.
Client : Deep Offshore Technology co. / SADRA
Performing Load out ,Marine transportation and offshore Installation
engineering of Phase 13 Jackets.
Client : Deep Offshore Technology co. / SADRA
Engineering analysis, material Procurement , Clamps fabrication ,
Field Operation and deep sub sea activities for Mooring system
renovation of F3 Conductor.
Client : DANA Drilling Co
Completion of Jacket C of Phase 13 in South Pars field, Persian Gulf-Iran