WPE-1, NASR-5 & WPE-3 platforms conductor installation

Performing conductor installation for 3 platforms belong to SIRRI oil field.                    Client: Drilling Company International (DCI)

2D high resolution seismic survey in FARZAD A & B fields

Performing 2D high resolution seismic survey + Processing & Interpretation in FARZAD A & B fields to identify sub-seabed hazards.                                                                            Client: Pars Oil & Gas Company (POGC)

SPD17B Topside & Ancillaries Installation

Performing installation of SPD17B wellhead topside of SP17/18 south pars field.              Client: LOICO

Transportation and Installation of Abuzar Jackets

Transportation and Installation of A20 & A21 Jackets of Abuzar field.                                 Client : Jahan-Pars/DRG IOOC

Installation Engineering of WHP 07 WHP 08 in Hendijan Field

Performing Load out, Marine transportation and offshore Installation engineering of two wellhead Jackets.
Client: Delta offshore Co.

Installation Engineering of BGCP, BSP Jackets in Bahregan Field and ABGCP Jacket in Abouzar Field

Performing Engineering analysis and preparation of operational procedures for Transportation and Installation of 3 Jackets.
Client: Delta Offshore, Atlas offshore

Installation Engineering and Operation Management of FX &FY LQs in Foroozan field

This project consist of engineering services, project management and offshore operation management services for Load out , Marine Transportation and Installation of two LQ topsides (FX & FY) in Foroozan field- Persian Gulf. Wight of FX platform is 250ton and FY weight is 750 ton. 
 The platforms are being fabricated in ROG yard in SHARJE-UAE.
Clients: Delta offshore co., Nardis co. ,IOEC, IOOC

Project and Operation management of Reshadat Jackets

In this project we provided consultancy services, engineering services , project and offshore operation services to TASDID co. for load out , Marine transportation and Installation of two jackets in Reshadat field. The jackets are fabricated in TASDID yard in Khorramshahr and Installation subcontractor is DOT co. tP4 jacket is a production platform jacket with 2800 ton weight and installation method is Launching –floating upending. F4 is about 350 ton it’s a tripod flare
Clients: Tasdid, IOOC

Installation Engineering of South Pars Phase 14 jackets

Performing Engineering analysis and preparation of operational procedures for Transportation and Installation of Phase 14 Jackets.
Client : Deep Offshore Technology co. / SADRA

Installation Engineering of South Pars Phase 13 jackets

Performing Load out ,Marine transportation and offshore Installation engineering of Phase 13 Jackets.
Client : Deep Offshore Technology co. / SADRA

Mooring of F3 Conductor pipe ,Ferdows Field

Engineering analysis, material Procurement , Clamps fabrication , Field Operation and deep sub sea activities for Mooring system renovation of F3 Conductor.
Client : DANA Drilling Co

SPD 13-C Jacket Installation

Completion of Jacket C of Phase 13 in South Pars field, Persian Gulf-Iran